Skip to main content

9 Free Printable Summer Chore Chart Templates for Kids (PDF Download)

← Back to Blog

Summer break is here — and if you don’t give kids some structure, the house turns into a disaster zone by week two. These free printable summer chore chart templates give your kids just enough responsibility to stay productive while still enjoying their break.

Each template is designed for a different summer activity. Print them out, stick them on the fridge, and watch your kids actually want to check things off. (Points and rewards help.)

Download All 9 Free Templates

Click any template to download the PDF. Print at home on standard letter paper (8.5 x 11).

Pool & Outdoor Cleaning Template
Pool & Outdoor Cleaning

Weekly tracker for pool, yard, and outdoor chores

⬇️ Download PDF
Garden & Yard Work Template
Garden & Yard Work

Track watering, weeding, and outdoor plant care

⬇️ Download PDF
Pet Care Template
Pet Care

Daily feeding, walking, and grooming tracker

⬇️ Download PDF
Outdoor Adventure Template
Outdoor Adventure

Track chores AND outdoor adventures for double points

⬇️ Download PDF
Summer Reading Template
Summer Reading

Reading log + daily chore checklist combo

⬇️ Download PDF
Vacation Prep Template
Vacation Prep

7-day countdown with family member assignments

⬇️ Download PDF
Kitchen Helper Template
Kitchen Helper

Meal prep tasks: set table, wash veggies, load dishwasher

⬇️ Download PDF
Room Deep Clean Template
Room Deep Clean

20-task challenge: organize, declutter, donate

⬇️ Download PDF
Family Goals Template
Family Goals

Shared family goal tracker with reward thermometer

⬇️ Download PDF

Why Summer Chore Charts Work

Kids thrive with structure — even in summer. A visible chore chart does three things:

  • Eliminates nagging — the chart tells them what to do, not you
  • Builds responsibility — they see their progress and feel ownership
  • Earns rewards — points, screen time, allowance, or family outings

Tips for Using These Templates

  1. Let kids pick 2-3 templates that match their interests
  2. Set clear point values — harder chores = more points
  3. Define the reward upfront — "50 points = movie night"
  4. Post it where they see it — fridge, bedroom door, or bathroom mirror
  5. Review weekly — celebrate wins, adjust if needed

Want to Go Digital?

Paper charts work great — until they get lost or covered in juice stains. PointWiseSystem does everything these templates do, but automatically:

  • ✅ Kids check off tasks on their phone or tablet
  • ✅ Points calculate automatically
  • ✅ Parents get notified when tasks are done
  • ✅ Rewards are tracked and redeemed in-app
  • ✅ Works for multiple kids with different chore lists
Try PointWiseSystem Free →

Free for 2 kids. No credit card required.

Age-Appropriate Summer Chores

  • Ages 4-5: Water plants, feed pets, pick up toys, wipe table
  • Ages 6-8: Make bed, load dishwasher, sweep porch, fold laundry
  • Ages 9-11: Mow lawn, cook simple meals, clean bathroom, organize closet
  • Ages 12+: Deep clean rooms, grocery shopping, babysit siblings, meal prep

For a complete breakdown, check our age-appropriate chores guide.

Share These Templates

Know a parent who could use some summer structure? Share this page — all templates are free, no signup required.

🎯 Tasks done. Habits built. Family organized. Start Free →